< back to schedule

Bending the River Back Into the City

May 12, 2018
3:10  -  3:25
Main Atrium, First Floor, Queens Museum

This year, Lauren Bon and the Metabolic Studio will break ground on Bending the River Back Into the City. This will begin the process of diverting water from the LA River through a wetland and cleaning facility at the Metabolic Studio. The water will be distributed through subterranean irrigation to the Los Angeles State Historic Park and the future Albion River Park. Bending the River Back Into the City culminates Lauren Bon’s cycle of works reconnecting the LA River to it’s floodplain.

2018  Open Platform